Plaster Cladding Systems specialise in premier specialist coating and cladding systems. We pride ourselves on providing top-class service combined with the highest standards of quality workmanship.
Our commitment to providing quality workmanship is achieved through substantial training to ensure our employees are qualified and up-to-date with the latest systems and procedures. This commitment is further enhanced by our quality assurance systems that ensure the quality of our final product.
Greg Keenan
Director
Refurbishment Projects
Project 0105 – Cement Sheet & Concrete – Sto Remedial System
Project Wood Street – Existing Concrete Block – Stolit K MP Natural with Scribed Pointing
Project 005130 – Hebel Block – Sto Remedial System
New Build Projects
Project 0078 – Hebel Panel – Sto Plaster System
Project 0019 – Concrete Block – StoArmat Miral System
Project 0102 – Concrete Block Construction – Sto Plaster System
Project 000548 – Hebel Block – Sto Plaster System
Special Finishes
Ambitec Suave
StoCalce Functio Interior Plaster
Stolit K MP Natural
Natural Exposed Aggregate
Does your cladding systems meet the 4D's of weather management?
Yes, our cladding systems satisfy each of the 4D’s recommended by the Department of Building. The 4D’s consist of (1)Deflection (2)Drainage (3)Drying (4)Durability/decay-resistant.
Do your cladding systems have Drained cavities?
Yes, to achieve Drainage and Drying all our cladding systems have Drained cavities.
Will my children put holes in the cladding with their cricket balls?
It is highly unlikely that any damage can be done without a large amount of force. All Polystyrene systems that we are licensed with have enough impact resistance to allow for everyday knocks and impact. If you are concerned about the impact resistance, you can specify a solid plaster system for all lower storey walls which increases impact resistance.
Can you plaster over painted brick or blockwork?
Yes, as long as the surface has been well cleaned. However, it is important to understand that the plaster will only adhere to the brickwork as efficiently as the paint. An adhesive test should be done on the paint prior to plastering.
As a Project Manager I need to associate with professionals who provide me with what I require in good time and information that is precise and accurate. My reputation relies on this and the final result.
I have been dealing with Plaster Cladding Systems for many years and am more than satisfied with the support and quality of workmanship.
Username 1
Recently my husband and I undertook a building project of our own where we chose to have a monolithic finish over our new masonry home. Plaster Cladding Systems were recommended to us by a builder our neighbours had previously used. We found the entire process from the initial site visit with the Manager, through to the quoting process, right through the entire construction duration to be hassle free.
Plaster Cladding Systems achieved the bespoke texture finish we were looking for. We are so happy with the final result and have no hesitation in recommending the team at Plaster Cladding to anyone wanting a plaster finish.